|
|
Are you 5G ready? |
|
Remote Radio Units (RRU) will become more prevalent with 5G. The increase in data traffic will require additional RRUs with a demand for more power. CommScope’s PowerShift® proves to be an effective solution for power inefficiencies without exhausting CAPEX. Here’s why, PowerShift: |
|
|
• |
|
Reduces CAPEX by utilizing existing cables – higher-wattage remote radio units require thicker, more expensive copper cables. |
|
• |
|
Eliminates the need for a tower-top converter with its plug-and-play DC power supply. |
|
• |
|
Optimizes the transmission of electrical power by regulating voltage at the RRU or remote. |
|
• |
|
Increases the amount of time a battery backup runs, allowing RRUs to stay active up to 35% longer in the event of a power outage. |
|
• |
|
Supports up to 2,000 wattage per circuit, with power connectors in the front. |
|
|
|
For a complete solution, don’t forget RRU Power Cables, Heliax FiberFeed Hybrid Jumpers, Retrofit Kits, and Mounting/Hardware Accessories: |
|
|
|
|
|
|